davidrocke
Newbie Joined: 15 December 2008 Status: Offline Points: 2 |
Post Options
Thanks(0)
Posted: 15 December 2008 at 4:08am |
I am developing a utility that allows Production Line managers to set up production runs on the codejock calendar control. I need to be able to show the calendars for multiple production lines side by side linked across by time.
I plan to represent the different lines as different resources within a day view. The problem I have encountered is that I can't seem to set different start and end times for the different resources (the highlighted area).
Has anyone found a way of doing this?
I may end up creating a control that can align as many codejock calendars side by side as required. I would use WIndows API calls to track and copy scrolling to ensure time alignment.
Any help would be appreciated.
Thanks. |
|
David Rocke,
Software Developer. Scotland, UK |
|