<?xml version="1.0" encoding="utf-8" ?>
<?xml-stylesheet type="text/xsl" href="RSS_xslt_style.asp" version="1.0" ?>
<rss version="2.0" xmlns:WebWizForums="https://syndication.webwiz.net/rss_namespace/">
 <channel>
  <title>Codejock Developer Community : Different Start/End Times for Resources</title>
  <link>http://forum.codejock.com/</link>
  <description><![CDATA[This is an XML content feed of; Codejock Developer Community : Calendar : Different Start/End Times for Resources]]></description>
  <copyright>Copyright (c) 2006-2013 Web Wiz Forums - All Rights Reserved.</copyright>
  <pubDate>Fri, 29 May 2026 20:11:48 +0000</pubDate>
  <lastBuildDate>Mon, 15 Dec 2008 04:08:17 +0000</lastBuildDate>
  <docs>http://blogs.law.harvard.edu/tech/rss</docs>
  <generator>Web Wiz Forums 12.04</generator>
  <ttl>360</ttl>
  <WebWizForums:feedURL>forum.codejock.com/RSS_post_feed.asp?TID=12926</WebWizForums:feedURL>
  <image>
   <title><![CDATA[Codejock Developer Community]]></title>
   <url>http://forum.codejock.com/forum_images/codejock-logo.gif</url>
   <link>http://forum.codejock.com/</link>
  </image>
  <item>
   <title><![CDATA[Different Start/End Times for Resources : I am developing a utility that...]]></title>
   <link>http://forum.codejock.com/forum_posts.asp?TID=12926&amp;PID=43672&amp;title=different-start-end-times-for-resources#43672</link>
   <description>
    <![CDATA[<strong>Author:</strong> <a href="http://forum.codejock.com/member_profile.asp?PF=4803">davidrocke</a><br /><strong>Subject:</strong> 12926<br /><strong>Posted:</strong> 15 December 2008 at 4:08am<br /><br />I am developing a utility that allows Production Line managers to set up production runs on the codejock calendar control. I need to be able to show the calendars for multiple production lines side by side linked across by time. <DIV>I plan to represent the different lines as different resources within a day view. The problem I have encountered is that I can't seem to&nbsp;set different start and end times for the different resources (the highlighted area).<DIV>&nbsp;</DIV><DIV>Has anyone found a way of doing this?</DIV><DIV>&nbsp;</DIV><DIV>I may end up creating a control that can align as many codejock calendars side by side as required. I would use WIndows API calls to track and copy scrolling to ensure time alignment.</DIV><DIV>&nbsp;</DIV><DIV>Any help would be appreciated.</DIV><DIV>&nbsp;</DIV><DIV>Thanks.</DIV></DIV>]]>
   </description>
   <pubDate>Mon, 15 Dec 2008 04:08:17 +0000</pubDate>
   <guid isPermaLink="true">http://forum.codejock.com/forum_posts.asp?TID=12926&amp;PID=43672&amp;title=different-start-end-times-for-resources#43672</guid>
  </item> 
 </channel>
</rss>