Codejock Forums Homepage
Forum Home Forum Home > Codejock Products > ActiveX COM > Calendar
  New Posts New Posts RSS Feed - Calendar Control Bugs
  FAQ FAQ  Forum Search   Events   Register Register  Login Login

Calendar Control Bugs

 Post Reply Post Reply
Author
Message
jpcoffeyXXX View Drop Down
Groupie
Groupie


Joined: 16 August 2005
Location: United States
Status: Offline
Points: 31
Post Options Post Options   Thanks (0) Thanks(0)   Quote jpcoffeyXXX Quote  Post ReplyReply Direct Link To This Post Topic: Calendar Control Bugs
    Posted: 10 June 2009 at 10:06am
The CodeJock controls are great, howevery I think I may have found two bugs in the calendar control.
 
1.  Using the datapicker, when switching to xtpCalendarDayView from any other view, the transition will proceed as expected with the day showing.  When switching to xtpCalendarDayView from xtpCalendarWorkWeekView, the work week will change but the calendar will not move to xtpCalendarDayView.  It will stay in xtpCalendarWorkWeekView no matter which day is clicked.  The work week will change, but it will remain in work week mode.
 
2.  Scroll bars.  When using the SuiteControls vertical scroll bars, the scrolling works perfectly.  However, if I transition out of time line mode, there will be two scroll bars showing with widely differing functionality.  This can be verified using the delivered sample VB project for the calendar.
 
Cheers,
 
John P. Coffey
 
Back to Top
 Post Reply Post Reply
  Share Topic   

Forum Jump Forum Permissions View Drop Down

Forum Software by Web Wiz Forums® version 12.04
Copyright ©2001-2021 Web Wiz Ltd.

This page was generated in 0.156 seconds.