Print Page | Close Window

Calendar Control Bugs

Printed From: Codejock Forums
Category: Codejock Products
Forum Name: Calendar
Forum Description: Topics Related to Codejock Calendar
URL: http://forum.codejock.com/forum_posts.asp?TID=14491
Printed Date: 06 October 2024 at 9:27pm
Software Version: Web Wiz Forums 12.04 - http://www.webwizforums.com


Topic: Calendar Control Bugs
Posted By: jpcoffeyXXX
Subject: Calendar Control Bugs
Date Posted: 10 June 2009 at 10:06am
The CodeJock controls are great, howevery I think I may have found two bugs in the calendar control.
 
1.  Using the datapicker, when switching to xtpCalendarDayView from any other view, the transition will proceed as expected with the day showing.  When switching to xtpCalendarDayView from xtpCalendarWorkWeekView, the work week will change but the calendar will not move to xtpCalendarDayView.  It will stay in xtpCalendarWorkWeekView no matter which day is clicked.  The work week will change, but it will remain in work week mode.
 
2.  Scroll bars.  When using the SuiteControls vertical scroll bars, the scrolling works perfectly.  However, if I transition out of time line mode, there will be two scroll bars showing with widely differing functionality.  This can be verified using the delivered sample VB project for the calendar.
 
Cheers,
 
John P. Coffey
 



Print Page | Close Window

Forum Software by Web Wiz Forums® version 12.04 - http://www.webwizforums.com
Copyright ©2001-2021 Web Wiz Ltd. - https://www.webwiz.net