multiple resource problem |
Post Reply |
Author | |
arianna
Newbie Joined: 16 November 2012 Location: Roma Status: Offline Points: 2 |
Post Options
Thanks(0)
Posted: 16 November 2012 at 7:46am |
Hi, I have a problem with multiple resources. I use calendar Activex control with .net 2008, Windows 7 64 The calendar is already inside the software and all goes well but now, I need to add multiple columns for every day in weekview. I add the example code to my program but I cannot load multiple resources. I have an error in g_DataResourcesMan.ApplyToCalendar(ocal) Even if I use the mnuMultiSchedulesSimple_Click is the same, but on the CalendarControl.SetMultipleResources(arResources) The ERROR is “Value does not fall within the expected range” Can you please Help me? Thank you very much. Arianna
|
|
Post Reply | |
Tweet
|
Forum Jump | Forum Permissions You cannot post new topics in this forum You cannot reply to topics in this forum You cannot delete your posts in this forum You cannot edit your posts in this forum You cannot create polls in this forum You cannot vote in polls in this forum |