Print Page | Close Window

multiple resource problem

Printed From: Codejock Forums
Category: Codejock Products
Forum Name: Calendar
Forum Description: Topics Related to Codejock Calendar
URL: http://forum.codejock.com/forum_posts.asp?TID=20308
Printed Date: 04 December 2024 at 9:05pm
Software Version: Web Wiz Forums 12.04 - http://www.webwizforums.com


Topic: multiple resource problem
Posted By: arianna
Subject: multiple resource problem
Date Posted: 16 November 2012 at 7:46am
Hi,
I have a problem with multiple resources. 
I use calendar Activex control with  .net 2008, Windows 7 64
The calendar is already inside the software and all goes well but now, I need to add multiple columns for every day in weekview.
I add the example code to my program but I cannot load multiple resources.
I have an error in 

g_DataResourcesMan.ApplyToCalendar(ocal) 

Even if I use the mnuMultiSchedulesSimple_Click is the same, but on the 

CalendarControl.SetMultipleResources(arResources)


The ERROR is “Value does not fall within the expected range”
Can you please Help me?

Thank you very much.
Arianna



Print Page | Close Window

Forum Software by Web Wiz Forums® version 12.04 - http://www.webwizforums.com
Copyright ©2001-2021 Web Wiz Ltd. - https://www.webwiz.net