Codejock Forums Homepage
Forum Home Forum Home > Codejock Products > ActiveX COM > Calendar
  New Posts New Posts RSS Feed - Different Start/End Times for Resources
  FAQ FAQ  Forum Search   Events   Register Register  Login Login

Different Start/End Times for Resources

 Post Reply Post Reply
Author
Message
davidrocke View Drop Down
Newbie
Newbie


Joined: 15 December 2008
Status: Offline
Points: 2
Post Options Post Options   Thanks (0) Thanks(0)   Quote davidrocke Quote  Post ReplyReply Direct Link To This Post Topic: Different Start/End Times for Resources
    Posted: 15 December 2008 at 4:08am
I am developing a utility that allows Production Line managers to set up production runs on the codejock calendar control. I need to be able to show the calendars for multiple production lines side by side linked across by time.
I plan to represent the different lines as different resources within a day view. The problem I have encountered is that I can't seem to set different start and end times for the different resources (the highlighted area).
 
Has anyone found a way of doing this?
 
I may end up creating a control that can align as many codejock calendars side by side as required. I would use WIndows API calls to track and copy scrolling to ensure time alignment.
 
Any help would be appreciated.
 
Thanks.
David Rocke,
Software Developer.
Scotland, UK
Back to Top
 Post Reply Post Reply
  Share Topic   

Forum Jump Forum Permissions View Drop Down

Forum Software by Web Wiz Forums® version 12.04
Copyright ©2001-2021 Web Wiz Ltd.

This page was generated in 0.156 seconds.