Print Page | Close Window

Different Start/End Times for Resources

Printed From: Codejock Forums
Category: Codejock Products
Forum Name: Calendar
Forum Description: Topics Related to Codejock Calendar
URL: http://forum.codejock.com/forum_posts.asp?TID=12926
Printed Date: 07 May 2024 at 3:33am
Software Version: Web Wiz Forums 12.04 - http://www.webwizforums.com


Topic: Different Start/End Times for Resources
Posted By: davidrocke
Subject: Different Start/End Times for Resources
Date Posted: 15 December 2008 at 4:08am
I am developing a utility that allows Production Line managers to set up production runs on the codejock calendar control. I need to be able to show the calendars for multiple production lines side by side linked across by time.
I plan to represent the different lines as different resources within a day view. The problem I have encountered is that I can't seem to set different start and end times for the different resources (the highlighted area).
 
Has anyone found a way of doing this?
 
I may end up creating a control that can align as many codejock calendars side by side as required. I would use WIndows API calls to track and copy scrolling to ensure time alignment.
 
Any help would be appreciated.
 
Thanks.


-------------
David Rocke,
Software Developer.
Scotland, UK



Print Page | Close Window

Forum Software by Web Wiz Forums® version 12.04 - http://www.webwizforums.com
Copyright ©2001-2021 Web Wiz Ltd. - https://www.webwiz.net