Codejock Forums Homepage
Forum Home Forum Home > Codejock Products > ActiveX COM > Calendar
  New Posts New Posts RSS Feed - ApplyToCalendar  clear LabelList...
  FAQ FAQ  Forum Search   Events   Register Register  Login Login

ApplyToCalendar clear LabelList...

 Post Reply Post Reply
Author
Message
flauzer View Drop Down
Senior Member
Senior Member
Avatar

Joined: 30 December 2003
Location: Italy
Status: Offline
Points: 108
Post Options Post Options   Thanks (0) Thanks(0)   Quote flauzer Quote  Post ReplyReply Direct Link To This Post Topic: ApplyToCalendar clear LabelList...
    Posted: 01 September 2006 at 7:48am
I'm not sure if this is a bug, anyway....
 
It's correct that   CalendarResourcesManager.ApplyToCalendar ....  
 
clear (ie "erase and set to default") a custom LabelList Collection of 
 
CalendarControl?
 
Thanks.
 
Back to Top
sserge View Drop Down
Moderator Group
Moderator Group


Joined: 01 December 2004
Status: Offline
Points: 1297
Post Options Post Options   Thanks (0) Thanks(0)   Quote sserge Quote  Post ReplyReply Direct Link To This Post Posted: 01 September 2006 at 8:25am
Labels collection (as well as Schedules collection) is held not in Calendar, but in Data Provider.

When you call ApplyToCalendar -- the default (or currently set) data provider is released and you apply a new one from the applied resources.
 
I mean you have to configure Labels collection in the Data Provider which is used in your resources. 

--
WBR,
Serge
Back to Top
flauzer View Drop Down
Senior Member
Senior Member
Avatar

Joined: 30 December 2003
Location: Italy
Status: Offline
Points: 108
Post Options Post Options   Thanks (0) Thanks(0)   Quote flauzer Quote  Post ReplyReply Direct Link To This Post Posted: 01 September 2006 at 8:59am
Ok.....Thanks.
Back to Top
 Post Reply Post Reply
  Share Topic   

Forum Jump Forum Permissions View Drop Down

Forum Software by Web Wiz Forums® version 12.04
Copyright ©2001-2021 Web Wiz Ltd.

This page was generated in 0.172 seconds.