Codejock Forums Homepage
Forum Home Forum Home > Codejock Products > ActiveX COM > Calendar
  New Posts New Posts RSS Feed - Just wondering
  FAQ FAQ  Forum Search   Events   Register Register  Login Login

Just wondering

 Post Reply Post Reply
Author
Message
moe188 View Drop Down
Senior Member
Senior Member


Joined: 27 March 2006
Status: Offline
Points: 220
Post Options Post Options   Thanks (0) Thanks(0)   Quote moe188 Quote  Post ReplyReply Direct Link To This Post Topic: Just wondering
    Posted: 14 August 2008 at 11:55am
hi,
I don't want the user to creat/add new event between certain hours, and not add event ib entire day (for instance Sunday).
please let me know how
Thank you
Back to Top
AndreiM View Drop Down
Moderator Group
Moderator Group
Avatar

Joined: 18 August 2007
Status: Offline
Points: 132
Post Options Post Options   Thanks (0) Thanks(0)   Quote AndreiM Quote  Post ReplyReply Direct Link To This Post Posted: 14 August 2008 at 1:56pm
Hi,
There are  BeforeEditOperation and IsEditOperationDisabled events.
They have a lot of options to allow you control all user actions.
Back to Top
 Post Reply Post Reply
  Share Topic   

Forum Jump Forum Permissions View Drop Down

Forum Software by Web Wiz Forums® version 12.04
Copyright ©2001-2021 Web Wiz Ltd.

This page was generated in 0.203 seconds.