Print Page | Close Window

FirstWeekOfYearDays-BUG!

Printed From: Codejock Forums
Category: Codejock Products
Forum Name: Calendar
Forum Description: Topics Related to Codejock Calendar
URL: http://forum.codejock.com/forum_posts.asp?TID=5580
Printed Date: 23 November 2024 at 12:35am
Software Version: Web Wiz Forums 12.04 - http://www.webwizforums.com


Topic: FirstWeekOfYearDays-BUG!
Posted By: Waescher
Subject: FirstWeekOfYearDays-BUG!
Date Posted: 22 November 2006 at 8:59am
Hi there,

i might have found a bug using the Datepicker-Control (v 10.3.1).

Example:
The 1st (left) DatePicker is placed in the form.
The 2nd (right) DatePicker is placed in a VB-UserControl (with a Combobox) and is shown in the DropDown-Event of the ComboBox.

In both of the controls the FirstWeekOfYearDays-Property is set to 4 (german standard).

The left one seems to be okay, but the Popup-Picker on the right doesn't care about that property.


The picture below shows that problem:

The right picker on the first form shows the wrong FirstWeekOfTheYear (1 & 2 instead 52 & 1),
the right picker on the second form shows the wrong WeekIndex (48 instead 47) as Today's Week.




btw: I tested this with Visual Basic 6 and Visual FoxPro 6...

Any suggestions to handle this problem?!

Thanks,
Waescher



Replies:
Posted By: Waescher
Date Posted: 05 December 2006 at 2:45am
no suggestions so far... ?!


Posted By: sserge
Date Posted: 06 December 2006 at 4:03pm
Well, a suggestion is to wait until the next release.
It is actually a bug, which will be fixed there...

--
WBR,
Serge


Posted By: Waescher
Date Posted: 06 December 2006 at 4:11pm
Ok, that'll be fine!
Thanks!



Print Page | Close Window

Forum Software by Web Wiz Forums® version 12.04 - http://www.webwizforums.com
Copyright ©2001-2021 Web Wiz Ltd. - https://www.webwiz.net