Print Page | Close Window

Calendar control - Date problems

Printed From: Codejock Forums
Category: Codejock Products
Forum Name: Suite Pro
Forum Description: Topics Related to Codejock Suite Pro
URL: http://forum.codejock.com/forum_posts.asp?TID=2551
Printed Date: 17 November 2024 at 9:48am
Software Version: Web Wiz Forums 12.04 - http://www.webwizforums.com


Topic: Calendar control - Date problems
Posted By: softaca
Subject: Calendar control - Date problems
Date Posted: 08 July 2005 at 7:04am

 As i was playing with the new calendar control i encountered the following BIG problem. I made an new appointment from the 6th of july through the 8th of july (see screen1.zip). http://forum.codejock.com/uploads/softaca/2005-07-08_070310_Screen1.zip - 2005-07-08_070310_Screen1.zip

I use european date notation. As long as i keep the application alive there is no problem. When i close the application however and the events are saved to the database and i reopen the application the month and day values are switched and my original appointment changes from 6 - 8 july to 7 june to 7 august  (see screen2.zip). http://forum.codejock.com/uploads/softaca/2005-07-08_070332_Screen2.zip - 2005-07-08_070332_Screen2.zip

 Is this a known bug and will it be fixed soon?

As i am posting about this control, a request/question. Will there be any print functionality in a future release?

 




Replies:
Posted By: SuperMario
Date Posted: 22 March 2006 at 2:57pm
Will be available in version 10 coming soon  Beta 2 is available now with Calendar Printing.  beta.codejock.com to download.     



Print Page | Close Window

Forum Software by Web Wiz Forums® version 12.04 - http://www.webwizforums.com
Copyright ©2001-2021 Web Wiz Ltd. - https://www.webwiz.net