Print Page | Close Window

Gantt Control

Printed From: Codejock Forums
Category: Codejock Products
Forum Name: Calendar
Forum Description: Topics Related to Codejock Calendar
URL: http://forum.codejock.com/forum_posts.asp?TID=13197
Printed Date: 21 November 2024 at 5:04pm
Software Version: Web Wiz Forums 12.04 - http://www.webwizforums.com


Topic: Gantt Control
Posted By: inforapid
Subject: Gantt Control
Date Posted: 17 January 2009 at 11:26pm
I like your calendar control, but the thing I'm mainly missing is a Gantt view. I've seen that BCGSoft offers one for their BCGSuite. Is it planed to include a Gantt view in a further release or do I have to look for another solution?
I'm looking forward to hearing from you.
Kind Regards
Ingo



Replies:
Posted By: SuperMario
Date Posted: 22 January 2009 at 2:38pm
Yes, it is planned.


Posted By: inforapid
Date Posted: 23 January 2009 at 12:46am
As a start, it would be sufficient to have something like a task view, where I can scroll horizontally through the days and where I can scroll vertically through the events (tasks). Something similar as your week view, but without the hours part and with a horizontal scroll bar to scroll through the weeks and a vertical scroll bar to scroll through the events (if there are a lot of events defined for a day). And if the user could change the scale of the horizontal time axis, it would be fantastic.
Kind Regards
Ingo


Posted By: mdoubson
Date Posted: 23 January 2009 at 10:12am
This is that we are releasing in 13 - Timeline Mode (this is comment to PREV post)


Posted By: mgampi
Date Posted: 23 January 2009 at 10:34am
Originally posted by mdoubson mdoubson wrote:

This is that we are releasing in 13 - Timeline Mode

Hi does this mean, for rel 13 you're planning to release something like Outlooks timeline or is it really a full Gantt chart type as show in sample image below:



The last one would be great!!!


-------------
Martin

Product: Xtreme Toolkit v 22.1.0, new Projects v 24.0.0
Platform: Windows 10 v 22H2 (64bit)
Language: VC++ 2022


Posted By: mdoubson
Date Posted: 23 January 2009 at 11:28am
Like Outlook - and first version - not all features implemented yet


Posted By: mgampi
Date Posted: 23 January 2009 at 3:55pm
Do you have plans to extend the gantt control to something similar as shown in my image?


-------------
Martin

Product: Xtreme Toolkit v 22.1.0, new Projects v 24.0.0
Platform: Windows 10 v 22H2 (64bit)
Language: VC++ 2022


Posted By: mdoubson
Date Posted: 23 January 2009 at 4:06pm
I think so - just take some time. Btw - in our Report component in Release 13 we will have similar element - color rectangle inside report item with size related to % value and text of value and developers can extend it to use in GANTT mode. 


Posted By: inforapid
Date Posted: 24 January 2009 at 12:05am
I think you can't use a report control to draw a Gantt chart, because the tasks in the Gantt chart start somewhere in one column and end somewhere in another column, but your report control will allow only a bar inside one column element.
Kind Regards
Ingo


Posted By: mdoubson
Date Posted: 24 January 2009 at 12:23am
Essentially this is not a problem - once I implemented Gantt chart component based on own extention of CodeProject grid. Each column represent some time unit and you can fill all columns in interval for given task with task one color and paint already completed part in another color and put text with % complete and task name or description.
CJ RC also kind of grid so it is possible use it to build task managment with percent complete indicator.
Another approach - not grid-based - use CJ Calendar with coming Timeline mode. Let's see that happens in coming months. 



Print Page | Close Window

Forum Software by Web Wiz Forums® version 12.04 - http://www.webwizforums.com
Copyright ©2001-2021 Web Wiz Ltd. - https://www.webwiz.net