Some Questions/Wishes
Printed From: Codejock Forums
Category: Codejock Products
Forum Name: Calendar
Forum Description: Topics Related to Codejock Calendar
URL: http://forum.codejock.com/forum_posts.asp?TID=10692
Printed Date: 07 October 2024 at 7:26am Software Version: Web Wiz Forums 12.04 - http://www.webwizforums.com
Topic: Some Questions/Wishes
Posted By: Josef
Subject: Some Questions/Wishes
Date Posted: 19 May 2008 at 6:53pm
Hello,
I have a couple of questions/whishes about Calendar Control:
1. If CalendarThemeOffice2007.DayView.TimeScale.BackgroundColor is changed the control looks inconsistent.
Because Captionbar colors are left unchanged.
In my opinion, the following properties are missing:
CalendarThemeOffice2007.CaptionBar.BackgroundColor
CalendarThemeOffice2007.CaptionBar.Caption.Color
CalendarThemeOffice2007.CaptionBar.Caption.Font
CalendarThemeOffice2007.CaptionBar.SwitchViewButtons.BackgroundColor
CalendarThemeOffice2007.CaptionBar.SwitchViewButtons.Caption.Color
CalendarThemeOffice2007.CaptionBar.SwitchViewButtons.Caption.Font
CalendarThemeOffice2007.CaptionBar.ScrollDateButtons.BaseColor |
2. It would be great to be able to customize CaptionBarDateLabel (if possible, with XAML and Eventhandler)
CalendarControl.Options.CaptionBarDateLabel |
3. It would be also great if we can set the start and end hours in .DayView of the control like this:
CalendarControl.Options.DayStartTime = TimeSerial(8, 0, 0)
CalendarControl.Options.DayEndTime = TimeSerial(17, 0, 0) |
4. Please add an option to hide AllDayEvents Row:
CalendarControl.DayView.ShowAllDayEvents = False |
5. TodayBaseColor for DayView.Header does not change color of Header (allways Office2007-SelectedColor):
CalendarThemeOffice2007.DayView.Header.TodayBaseColor |
6. I'm using two CalenderResources with two custom Dataproviders:
.SetDataProvider2 "Provider=Custom; 0", False
.SetDataProvider2 "Provider=Custom; 1", False | In a few events I cannot determine which DataProvider should be used to handle the event:
DoGetAllEventsRaw
DoGetUpcomingEvents
DoRetrieveDayEvents | How do I know which Provider should be used?
I added a small sample program with "Debug.Assert false" statements where I think that something
is missing ( uploads/20080519_184736_Test.zip - 20080519_184736_Test.zip )
Thank you very much
Josef
------------- Product: Xtreme SuitePro ActiveX v13.2.1
Platform: Windows 2008 (64bit)
Language: Visual Basic 6.0
|
Replies:
Posted By: Josef
Date Posted: 23 May 2008 at 9:42pm
Hello,
at least, is there an answer for question 6.?
Thank you
Josef
------------- Product: Xtreme SuitePro ActiveX v13.2.1
Platform: Windows 2008 (64bit)
Language: Visual Basic 6.0
|
Posted By: tobi
Date Posted: 24 May 2008 at 6:01am
Will it be able to modify the start and end times which are displayed in calender dayview in the near future ?
I would really need this feature !
|
Posted By: Fabian
Date Posted: 24 May 2008 at 11:03am
Me too!!!
------------- Product: Xtreme SuitePro (ActiveX) version 16.2.3
Platform: Windows 7 (32bit)
Language: Visual Basic 6.0 / SP6
|
Posted By: sserge
Date Posted: 10 July 2008 at 5:29pm
Hi,
Sorry for a delay, your suggestions are just wonderful and we will implement them in some of the nearest version (like 12.1 or 2).
As for question 6 -- just wondering, have you found the answer or a workaround?
-- WBR, Serge
|
Posted By: Josef
Date Posted: 14 July 2008 at 2:38pm
Hi Serge,
glad to hear that!
Unfortunately, I don't have a workaround for problem 6 yet.
Bye, Josef
------------- Product: Xtreme SuitePro ActiveX v13.2.1
Platform: Windows 2008 (64bit)
Language: Visual Basic 6.0
|
|