How to implement calendar control |
Post Reply |
Author | |
jshan
Groupie Joined: 07 December 2007 Status: Offline Points: 63 |
Post Options
Thanks(0)
Posted: 07 December 2007 at 11:04am |
Hi I want to implement caldendar control with vscroll, hcroll support to use in Cdialog base project.
I looked up the sample projects based on View model. No idea how to use them in my project.
if there is a way, plz post some example.
thanks in advance.
|
|
jshan
Groupie Joined: 07 December 2007 Status: Offline Points: 63 |
Post Options
Thanks(0)
|
I solved this myself. Just add static control and assign it to CXTPCalendarControl in CDialog
That 's all for starting.
|
|
Post Reply | |
Tweet
|
Forum Jump | Forum Permissions You cannot post new topics in this forum You cannot reply to topics in this forum You cannot delete your posts in this forum You cannot edit your posts in this forum You cannot create polls in this forum You cannot vote in polls in this forum |