Codejock Forums Homepage
Forum Home Forum Home > Codejock Products > ActiveX COM > Calendar
  New Posts New Posts RSS Feed - Multiple Sched w/ Days as columns instead of Time
  FAQ FAQ  Forum Search   Events   Register Register  Login Login

Multiple Sched w/ Days as columns instead of Time

 Post Reply Post Reply
Author
Message
dindo.lales View Drop Down
Groupie
Groupie


Joined: 01 August 2010
Status: Offline
Points: 20
Post Options Post Options   Thanks (0) Thanks(0)   Quote dindo.lales Quote  Post ReplyReply Direct Link To This Post Topic: Multiple Sched w/ Days as columns instead of Time
    Posted: 22 June 2011 at 6:59am
Hi Everyone,

I'm trying to create a calendar to show scheduled subjects/teacher for each room. Having a room as parameter, the calendar should show subjects and/or teachers for each day and Period (Period is predefined with specific time of day). Is this possible with the latest Calendar OCX?

Thanks for any help.

Please see attached image.

Product: Xtreme Calendar (ActiveX) version 13.4.0
Platform: Windows 7 Professional (32bit)
Language: Powerbuilder 11.5
Back to Top
SuperMario View Drop Down
Admin Group
Admin Group
Avatar

Joined: 14 February 2004
Status: Offline
Points: 18057
Post Options Post Options   Thanks (0) Thanks(0)   Quote SuperMario Quote  Post ReplyReply Direct Link To This Post Posted: 06 July 2011 at 1:48pm
It is not possible
Back to Top
jpbro View Drop Down
Senior Member
Senior Member
Avatar

Joined: 12 January 2007
Status: Offline
Points: 1354
Post Options Post Options   Thanks (0) Thanks(0)   Quote jpbro Quote  Post ReplyReply Direct Link To This Post Posted: 06 July 2011 at 4:27pm
Based on the screenshot, the ReportControl could be good choice.
Product: Xtreme SuitePro (ActiveX) version 16.2.6
Platform: Windows XP - SP3

Language: Visual Basic 6.0 SP6

Back to Top
dindo.lales View Drop Down
Groupie
Groupie


Joined: 01 August 2010
Status: Offline
Points: 20
Post Options Post Options   Thanks (0) Thanks(0)   Quote dindo.lales Quote  Post ReplyReply Direct Link To This Post Posted: 06 July 2011 at 9:47pm
Thanks guys. I'll try first the trial version of ReportControl before deciding if it would be great for my development.
Product: Xtreme Calendar (ActiveX) version 13.4.0
Platform: Windows 7 Professional (32bit)
Language: Powerbuilder 11.5
Back to Top
 Post Reply Post Reply
  Share Topic   

Forum Jump Forum Permissions View Drop Down

Forum Software by Web Wiz Forums® version 12.04
Copyright ©2001-2021 Web Wiz Ltd.

This page was generated in 0.125 seconds.