Codejock Forums Homepage
Forum Home Forum Home > Codejock Products > ActiveX COM > Calendar
  New Posts New Posts RSS Feed - Drog and Drop to CalendarControl
  FAQ FAQ  Forum Search   Events   Register Register  Login Login

Drog and Drop to CalendarControl

 Post Reply Post Reply
Author
Message
moe188 View Drop Down
Senior Member
Senior Member


Joined: 27 March 2006
Status: Offline
Points: 220
Post Options Post Options   Thanks (0) Thanks(0)   Quote moe188 Quote  Post ReplyReply Direct Link To This Post Topic: Drog and Drop to CalendarControl
    Posted: 27 February 2010 at 3:04pm
Hi,
is it possible to drog an item from a ReporControl to a CalendarControl, then register the drop as an event?
Thank you
Visual Baisc 6 SP6

Windows XP Pro Sp3, Windows 7
Codejock Xtreme SuitePro ActiveX 15.1.3
Back to Top
moe188 View Drop Down
Senior Member
Senior Member


Joined: 27 March 2006
Status: Offline
Points: 220
Post Options Post Options   Thanks (0) Thanks(0)   Quote moe188 Quote  Post ReplyReply Direct Link To This Post Posted: 02 March 2010 at 11:35am

any ideas? or it can not be done?

Visual Baisc 6 SP6

Windows XP Pro Sp3, Windows 7
Codejock Xtreme SuitePro ActiveX 15.1.3
Back to Top
arrozcon View Drop Down
Newbie
Newbie


Joined: 10 November 2009
Status: Offline
Points: 6
Post Options Post Options   Thanks (0) Thanks(0)   Quote arrozcon Quote  Post ReplyReply Direct Link To This Post Posted: 08 March 2010 at 10:27pm
I have the same question, anybody knows?
Back to Top
 Post Reply Post Reply
  Share Topic   

Forum Jump Forum Permissions View Drop Down

Forum Software by Web Wiz Forums® version 12.04
Copyright ©2001-2021 Web Wiz Ltd.

This page was generated in 0.141 seconds.