![]() |
Drog and Drop to CalendarControl |
Post Reply
|
| Author | |
moe188
Senior Member
Joined: 27 March 2006 Status: Offline Points: 225 |
Post Options
Thanks(0)
Quote Reply
Topic: Drog and Drop to CalendarControlPosted: 27 February 2010 at 3:04pm |
|
Hi,
is it possible to drog an item from a ReporControl to a CalendarControl, then register the drop as an event?
Thank you
|
|
|
Visual Baisc 6 SP6
Windows XP Pro Sp3, Windows 7 Codejock Xtreme SuitePro ActiveX 15.1.3 |
|
![]() |
|
moe188
Senior Member
Joined: 27 March 2006 Status: Offline Points: 225 |
Post Options
Thanks(0)
Quote Reply
Posted: 02 March 2010 at 11:35am |
|
any ideas? or it can not be done? |
|
|
Visual Baisc 6 SP6
Windows XP Pro Sp3, Windows 7 Codejock Xtreme SuitePro ActiveX 15.1.3 |
|
![]() |
|
arrozcon
Newbie
Joined: 10 November 2009 Status: Offline Points: 6 |
Post Options
Thanks(0)
Quote Reply
Posted: 08 March 2010 at 10:27pm |
|
I have the same question, anybody knows?
|
|
![]() |
|
Post Reply
|
|
|
Tweet
|
| Forum Jump | Forum Permissions ![]() You cannot post new topics in this forum You cannot reply to topics in this forum You cannot delete your posts in this forum You cannot edit your posts in this forum You cannot create polls in this forum You cannot vote in polls in this forum |