Codejock Forums Homepage
Forum Home Forum Home > Codejock Products > ActiveX COM > Calendar
  New Posts New Posts RSS Feed - Focus Perticular Date
  FAQ FAQ  Forum Search   Events   Register Register  Login Login

Focus Perticular Date

 Post Reply Post Reply
Author
Message
AbhishekGoenka View Drop Down
Newbie
Newbie


Joined: 31 March 2008
Status: Offline
Points: 14
Post Options Post Options   Thanks (0) Thanks(0)   Quote AbhishekGoenka Quote  Post ReplyReply Direct Link To This Post Topic: Focus Perticular Date
    Posted: 29 April 2008 at 7:59am
Hi

I am using calender Control

I want to select perticular day (focus) while switching from day view 1 to 5 or 7
Back to Top
prashant View Drop Down
Senior Member
Senior Member
Avatar

Joined: 19 February 2007
Location: India
Status: Offline
Points: 165
Post Options Post Options   Thanks (0) Thanks(0)   Quote prashant Quote  Post ReplyReply Direct Link To This Post Posted: 29 April 2008 at 8:05am
Try using

ShowDay / ShowDays function calls after switching the view.

For switching view use : SwitchActiveView()
Back to Top
 Post Reply Post Reply
  Share Topic   

Forum Jump Forum Permissions View Drop Down

Forum Software by Web Wiz Forums® version 12.04
Copyright ©2001-2021 Web Wiz Ltd.

This page was generated in 0.142 seconds.