Codejock Forums Homepage
Forum Home Forum Home > Codejock Products > Visual C++ MFC > Calendar
  New Posts New Posts RSS Feed - Calendar Newbie
  FAQ FAQ  Forum Search   Events   Register Register  Login Login

Calendar Newbie

 Post Reply Post Reply
Author
Message
Benestrophe View Drop Down
Newbie
Newbie


Joined: 12 February 2020
Location: San Antonio, TX
Status: Offline
Points: 6
Post Options Post Options   Thanks (0) Thanks(0)   Quote Benestrophe Quote  Post ReplyReply Direct Link To This Post Topic: Calendar Newbie
    Posted: 12 February 2020 at 6:11pm
I am new to the calendar control. I am using a custom data provider and am trying to figure out how to obtain the date range of the current view so that I can populate the days from a database. Which event fires when the date range of the current view changes? Also, if the date range is already populated, do I have to remove and re-populate the events or can the be refreshed? Any information is greatly appreciated. Thank you.
Back to Top
 Post Reply Post Reply
  Share Topic   

Forum Jump Forum Permissions View Drop Down

Forum Software by Web Wiz Forums® version 12.04
Copyright ©2001-2021 Web Wiz Ltd.

This page was generated in 0.141 seconds.