Hi,
As far as I can see the Calendar control only supports "simple week numbers", week one is the week with January 1st in it.
In most of (or all of) Europe we use ISO week numbers. In my country (Norway) week numbers is heavily used, and the end user expects ISO week numbers in a calendar.
So, my question is: Is it possible to get support for ISO week numbers in the calendar control?
The definition for ISO week 1 is:
Week 1 is the week that includes January 4th.
Here's a link to an C algorithm:
(look for "From the simple week number to the ISO week number")
Best regards,
Gøran
|
|
SuperMario
Admin Group Joined: 14 February 2004 Status: Offline Points: 18057 |
Post Options
Thanks(0)
|
Maybe you want wndDatePicker.FirstWeekOfYearDays = 4 for first 4 day week?
|
|
zeko78
Groupie Joined: 21 August 2006 Location: Norway Status: Offline Points: 11 |
Post Options
Thanks(0)
|
Thank you very much, that was just what I needed
|
|