Multischedule + Weekview +Horizontal Scroll bug |
Post Reply |
Author | |
Algae
Senior Member Joined: 08 January 2007 Location: United States Status: Offline Points: 217 |
Post Options
Thanks(0)
Posted: 23 October 2011 at 6:58pm |
Calendar - using either the sample or my own implementation:
To duplicate: 1. Set the view to either Work Week view or Week view with Column mode. 2. Select multiple schedules (I used 3 to test). 3. Create an event in the first column. 4. Drag the event to the right. You will see the calendar display jump to the last column when the edge threshold is reached. 5. Drag the event to the left. You will see the calendar display jump to the first column when the edge threshold is reached. This makes it impossible to drag and drop an event to some areas (days) inside a calendar displaying multiple schedules. |
|
Post Reply | |
Tweet
|
Forum Jump | Forum Permissions You cannot post new topics in this forum You cannot reply to topics in this forum You cannot delete your posts in this forum You cannot edit your posts in this forum You cannot create polls in this forum You cannot vote in polls in this forum |