Codejock Forums Homepage
Forum Home Forum Home > Codejock Products > Visual C++ MFC > Calendar
  New Posts New Posts RSS Feed - calender viewtype
  FAQ FAQ  Forum Search   Events   Register Register  Login Login

calender viewtype

 Post Reply Post Reply
Author
Message
Napalm View Drop Down
Newbie
Newbie


Joined: 13 July 2005
Status: Offline
Points: 5
Post Options Post Options   Thanks (0) Thanks(0)   Quote Napalm Quote  Post ReplyReply Direct Link To This Post Topic: calender viewtype
    Posted: 10 August 2005 at 9:28am

hello there,

when i change the viewtype setting to something different like workweek, nothing changes. When i display the property on load it shows the right value

am i forgetting something?

greetings

Tom

Back to Top
sserge View Drop Down
Moderator Group
Moderator Group


Joined: 01 December 2004
Status: Offline
Points: 1297
Post Options Post Options   Thanks (0) Thanks(0)   Quote sserge Quote  Post ReplyReply Direct Link To This Post Posted: 11 August 2005 at 7:40am
Hi Tom,

Try to call Populate() or RedrawControl() methods after changing ViewType.

See also Calendar demo project for more details.

--
WBR,
Serge
Back to Top
Napalm View Drop Down
Newbie
Newbie


Joined: 13 July 2005
Status: Offline
Points: 5
Post Options Post Options   Thanks (0) Thanks(0)   Quote Napalm Quote  Post ReplyReply Direct Link To This Post Posted: 11 August 2005 at 10:28am

hello,

when i put:

cal.ViewType=XtremeCalendarControl.CalendarViewType.xtpCalen darWorkWeekView;

cal.Populate();

in the onload event of my control it seems to work.

Maybe a little something to note for the following release?

Thanx!

 

 

Back to Top
 Post Reply Post Reply
  Share Topic   

Forum Jump Forum Permissions View Drop Down

Forum Software by Web Wiz Forums® version 12.04
Copyright ©2001-2021 Web Wiz Ltd.

This page was generated in 0.156 seconds.