Calendar Resources |
Post Reply |
Author | |
chris.enright
Newbie Joined: 12 November 2008 Status: Offline Points: 1 |
Post Options
Thanks(0)
Posted: 12 November 2008 at 8:28am |
New to this forum and new to calendar control so I hope I have posted this ok.
I have been adapting the calendar sample code supplied with the control and using the sqlhelper functions into an access database. I have got the code working and moving on to multi resources. I have the resources loading from the database and displaying events against all resources. The problem i have is that only the first resource updates when edited, all the others amend the underlying database but don't change on the control until the datasource is re-opened. I think it is to do with the changeevent on the dataproviders for each resource but I am stuck. When a change is made to the first resource it fires the populate events however all other resources just go through the prepopulate and not rereading the events. Thanks in advance for any help. |
|
Pparma
Newbie Joined: 02 October 2008 Location: Brazil Status: Offline Points: 5 |
Post Options
Thanks(0)
|
I wanted to know the same thing, cause it had the same doubt..
somebody to help?
regards,
|
|
Product: Xtreme SuitePro (ActiveX) 12.0.2
Platform: Win XP Language: Visual Basic 6.0 SP6 |
|
Post Reply | |
Tweet
|
Forum Jump | Forum Permissions You cannot post new topics in this forum You cannot reply to topics in this forum You cannot delete your posts in this forum You cannot edit your posts in this forum You cannot create polls in this forum You cannot vote in polls in this forum |