Drag n drop between calendar views? |
Post Reply |
Author | |
znakeeye
Senior Member Joined: 26 July 2006 Status: Offline Points: 1672 |
Post Options
Thanks(0)
Posted: 21 October 2006 at 10:51pm |
I have a splitter with two instances of CCalendarView. I want to be able to drag n drop events between these two views. Is that achievable? Any ideas? Thanks in advance! |
|
sserge
Moderator Group Joined: 01 December 2004 Status: Offline Points: 1297 |
Post Options
Thanks(0)
|
Hi,
Currently you can't do that. As a workaround, and the only way for a user to transfer events between these two views -- use copy/paste. -- WBR, Serge |
|
znakeeye
Senior Member Joined: 26 July 2006 Status: Offline Points: 1672 |
Post Options
Thanks(0)
|
Ok, thanks. Do you think that this kind of feature will be implemented?
Consider the scenario where you want to move a reservation of some kind. It would be very convenient if you could simply have two calendar views and drag it as described.
|
|
sserge
Moderator Group Joined: 01 December 2004 Status: Offline Points: 1297 |
Post Options
Thanks(0)
|
You probably can use multiple resources feature in this case.
|
|
znakeeye
Senior Member Joined: 26 July 2006 Status: Offline Points: 1672 |
Post Options
Thanks(0)
|
Ok? What do you mean by multiple resources?
|
|
sserge
Moderator Group Joined: 01 December 2004 Status: Offline Points: 1297 |
Post Options
Thanks(0)
|
Look at http://www.codejock.com/products/calendar/tour_7.asp and also regular Calendar sample application (look for multiple resources samples in the sample menu).
|
|