Codejock Forums Homepage
Forum Home Forum Home > Codejock Products > Visual C++ MFC > Calendar
  New Posts New Posts RSS Feed - attachtocalendar
  FAQ FAQ  Forum Search   Events   Register Register  Login Login

attachtocalendar

 Post Reply Post Reply
Author
Message
WD08 View Drop Down
Newbie
Newbie


Joined: 10 February 2006
Status: Offline
Points: 1
Post Options Post Options   Thanks (0) Thanks(0)   Quote WD08 Quote  Post ReplyReply Direct Link To This Post Topic: attachtocalendar
    Posted: 10 February 2006 at 9:21am
I use AttachToCalendar method to synchronize a Calendar Control and DatePicker Control.

when user picking a month or a year from a pop-up menu
the calendar is not update. why ?

thanks.

(I am french)
Back to Top
sserge View Drop Down
Moderator Group
Moderator Group


Joined: 01 December 2004
Status: Offline
Points: 1297
Post Options Post Options   Thanks (0) Thanks(0)   Quote sserge Quote  Post ReplyReply Direct Link To This Post Posted: 11 February 2006 at 3:49am
Hi,

When you're picking a month/year on a month caption, a DatePicker just changes it's own displayed month, and you're still have to select some days/weeks on the DatePicker itself. That's a default adopted behavior.

--
WBR,
Serge
Back to Top
 Post Reply Post Reply
  Share Topic   

Forum Jump Forum Permissions View Drop Down

Forum Software by Web Wiz Forums® version 12.04
Copyright ©2001-2021 Web Wiz Ltd.

This page was generated in 0.141 seconds.