CalendarTheme2007 and BeforeDrawDayViewCell |
Post Reply |
Author | |
g.achrainer
Newbie Joined: 06 June 2006 Location: Austria Status: Offline Points: 8 |
Post Options
Thanks(0)
Posted: 29 September 2006 at 5:20am |
Hi,
seems as if "BeforeDrawDayViewCell" only works when using the "old" 2003 theme, but not if I use the new 2007 theme. I want to display individual working time for each day as well as a planned lunch time. How would I do that using 10.3? Thanks in advance, Gerhard |
|
sserge
Moderator Group Joined: 01 December 2004 Status: Offline Points: 1297 |
Post Options
Thanks(0)
|
Hi,
When customizing themes (2007 and others in future) you can use another notification BeforeDrawThemeObject. Below is the example:
-- WBR, Serge |
|
g.achrainer
Newbie Joined: 06 June 2006 Location: Austria Status: Offline Points: 8 |
Post Options
Thanks(0)
|
Hi,
thanks for the hint, it almost works now, but there is one issue left: having a Variant as Parameter, which is an Interface or an object is not possible to implement in Gupta Teamdeveloper. I worked around that declaring the Parameter as Interface which seems to be ok as long as I don't use "xtpCalendarBeforeDraw_DayViewTimeScale" etc. Would be nice to have one parameter for the Interface, if any, and another for the numeric information. Anyway, for now it works, thank you once again. Regards, Gerhard |
|
Post Reply | |
Tweet
|
Forum Jump | Forum Permissions You cannot post new topics in this forum You cannot reply to topics in this forum You cannot delete your posts in this forum You cannot edit your posts in this forum You cannot create polls in this forum You cannot vote in polls in this forum |