yoavo View Drop Down
Senior Member
Senior Member


Joined: 29 February 2004
Location: Israel
Status: Offline
Points: 140
Post Options Post Options   Thanks (0) Thanks(0)   Quote yoavo Quote  Post ReplyReply Direct Link To This Post Topic: Gantt Control
    Posted: 13 October 2009 at 11:36am
Hi,
Is there a Gantt Control / TimeLine Control available in Xtreme ?
 
Yoav.
Back to Top
ABuenger View Drop Down
Newbie
Newbie
Avatar

Joined: 02 February 2006
Status: Offline
Points: 1075
Post Options Post Options   Thanks (0) Thanks(0)   Quote ABuenger Quote  Post ReplyReply Direct Link To This Post Posted: 15 October 2009 at 5:12pm
BCGSoft has one. I doubt that Codejock will have one within the next year.



http://www.bcgsoft.com/FeatureTour/tour242.htm

Codejock support
Back to Top
mgampi View Drop Down
Senior Member
Senior Member
Avatar

Joined: 14 July 2003
Status: Offline
Points: 1212
Post Options Post Options   Thanks (0) Thanks(0)   Quote mgampi Quote  Post ReplyReply Direct Link To This Post Posted: 15 October 2009 at 6:29pm
Originally posted by ABuenger ABuenger wrote:

BCGSoft has one. I doubt that Codejock will have one within the next year.



http://www.bcgsoft.com/FeatureTour/tour242.htm

Hi;

Have you used this control? What's your experience? Is it useable?
Martin

Product: Xtreme Toolkit v 22.1.0, new Projects v 24.0.0
Platform: Windows 10 v 22H2 (64bit)
Language: VC++ 2022
Back to Top
znakeeye View Drop Down
Senior Member
Senior Member
Avatar

Joined: 26 July 2006
Status: Offline
Points: 1672
Post Options Post Options   Thanks (0) Thanks(0)   Quote znakeeye Quote  Post ReplyReply Direct Link To This Post Posted: 16 October 2009 at 3:16am
My guess is that we will see such a control in a near future. But I'm just guessing :)
PokerMemento - http://www.pokermemento.com/
Back to Top
zaksoft View Drop Down
Senior Member
Senior Member
Avatar

Joined: 05 June 2003
Location: Italy
Status: Offline
Points: 164
Post Options Post Options   Thanks (0) Thanks(0)   Quote zaksoft Quote  Post ReplyReply Direct Link To This Post Posted: 16 October 2009 at 5:52am
Announced 2 or 3 years ago as upcoming, I still have to see charts (according to last post a beta is scheduled for november, so in 3..4 weeks)..
 
VS2022 - MFC MBCS Statically linked

XTP 23.1 Static Link

---------------------------------------------------------

Davide Zaccanti - ZakSoft - www.zaksoft.com

Back to Top
 Post Reply Post Reply

Forum Jump Forum Permissions View Drop Down

Forum Software by Web Wiz Forums® version 12.08
Copyright ©2001-2026 Web Wiz Ltd.

This page was generated in 0.079 seconds.