Question regarding recurrence event |
Post Reply |
Author | |
karthiksp
Groupie Joined: 09 May 2007 Location: United States Status: Offline Points: 30 |
Post Options
Thanks(0)
Posted: 12 March 2008 at 5:22pm |
uploads/20080312_172241_XML_FIles.zipHi All,
Here I am attaching 2 XML file that one is created by the application and other one is changed by the Calendar Control after I called the method If Not lole_XMLResource.DataProvider.Open = False Then lole_XMLResource.DataProvider.Create() End If XML I attached is one event with weekly recurrence end after 7 occurences. I see all the data in first XML file. After I call the above command, I pretty much lost "EndAfterOccurences" and other information in the XML. Could someone tell me, how come it is dropping some of the tags after I called the "CREATE" method. Thanks in advance Karthik |
|
Post Reply | |
Tweet
|
Forum Jump | Forum Permissions You cannot post new topics in this forum You cannot reply to topics in this forum You cannot delete your posts in this forum You cannot edit your posts in this forum You cannot create polls in this forum You cannot vote in polls in this forum |