Mutilple Schedules |
Post Reply |
Author | |||
mri0202
Newbie Joined: 07 October 2009 Status: Offline Points: 6 |
Post Options
Thanks(0)
Posted: 05 March 2012 at 8:05am |
||
Hi all,
In December 2011 I wrote to support because of a problem with 'multiple schedules' ( Because I got no answer until yet, I hope someone in the forum can help me. We have a custom database for saving calandar events. In our application it is possible, that a couple of people share one event. I've modified the example for ''multiple ressources'' for Visual Basic. - One schedule for every involved person - I clone the event - I change the schedule-Id of the cloned event. The problem is, that lets say four people share one event, only the first and the last is shown up in the calendar. What am I doing wrong. Thanks in advance Manfred Richter Code snippet ' Remove all resources CalendarControl.MultipleResources.RemoveAll fAnzMKzNameTab = Split(sMKzNamen, Chr(254)) fAnzMKzNrTab = Split(sMKzNr, Chr(254)) fAnzMKzTab = Split(sMkz, Chr(254)) Dim strConnectionString As String strConnectionString = "Provider=Custom" Dim arResources As New CalendarResources Dim pRes0 As New CalendarResource Dim pRes1 As CalendarResource pRes0.SetDataProvider2 strConnectionString, True If pRes0.DataProvider Is Nothing Then Debug.Assert False Exit Sub End If If Not pRes0.DataProvider.Open Then If Not pRes0.DataProvider.create Then Debug.Assert False Exit Sub End If End If '// ** schedules Dim pSchedules As CalendarSchedules Set pSchedules = pRes0.DataProvider.Schedules If pSchedules Is Nothing Then Exit Sub End If If pSchedules.Count < 1 Then For li = 0 To UBound(fAnzMKzNrTab) pSchedules.AddNewSchedule fAnzMKzTab(li) Next li pRes0.DataProvider.Save End If '// ** resources pRes0.Name = pSchedules.Item(0).Name pRes0.ScheduleIDs.Add pSchedules.Item(0).id arResources.Add pRes0 For li = 1 To UBound(fAnzMKzNrTab) Set pRes1 = New CalendarResource pRes1.SetDataProvider pRes0.DataProvider, False pRes1.Name = fAnzMKzTab(li) pRes1.ScheduleIDs.Add pSchedules.Item(li).id arResources.Add pRes1 Set pRes1 = Nothing Next li CalendarControl.SetMultipleResources arResources '------------------------------------------------------------------------------------- '* This routine is used to clone Events and point to the right schedule '------------------------------------------------------------------------------------- Private Sub fsBKZPruef(ByRef sEvents As XtremeCalendarControl.CalendarEvents, ByRef sEvent As CalendarEvent) On Error Resume Next Dim lBkzNrTab() As String Dim li As Integer Dim lID As Integer Dim lEvent As CalendarEvent Dim lInhalt As String lInhalt = sEvent.CustomProperties("BKZ_ZUWEISUNG") If lInhalt = "" Then Exit Sub End If lBkzNrTab = Split(lInhalt, vbCrLf) For li% = 0 To UBound(lBkzNrTab) - 1 lID = fForm.mtGetMkzId(Val(lBkzNrTab(li))) If lID > 0 Then Set lEvent = sEvent.CloneEvent lEvent.ScheduleID = lID sEvents.Add lEvent Set lEvent = Nothing End If Next li En |
|||
SuperMario
Admin Group Joined: 14 February 2004 Status: Offline Points: 18057 |
Post Options
Thanks(0)
|
||
Your issue was answered, did it work for you?
|
|||
mri0202
Newbie Joined: 07 October 2009 Status: Offline Points: 6 |
Post Options
Thanks(0)
|
||
I found a solution myself
|
|||
Post Reply | |
Tweet
|
Forum Jump | Forum Permissions You cannot post new topics in this forum You cannot reply to topics in this forum You cannot delete your posts in this forum You cannot edit your posts in this forum You cannot create polls in this forum You cannot vote in polls in this forum |