Codejock Forums Homepage
Forum Home Forum Home > Codejock Products > ActiveX COM > Calendar
  New Posts New Posts RSS Feed - multi schedule calendar
  FAQ FAQ  Forum Search   Events   Register Register  Login Login

multi schedule calendar

 Post Reply Post Reply
Author
Message
foxpro2000 View Drop Down
Groupie
Groupie
Avatar

Joined: 29 March 2009
Location: Italy
Status: Offline
Points: 17
Post Options Post Options   Thanks (0) Thanks(0)   Quote foxpro2000 Quote  Post ReplyReply Direct Link To This Post Topic: multi schedule calendar
    Posted: 30 January 2012 at 1:53pm
When I move a calendar appointment "multischedule" on the same hours but with different ScheduleId sometimes does not change the variable NSCHED, but if I move the event from ScheduleId with different time always works. I use the event "EventChangedEx"
nr = This.activeview.hittest.ViewGroup.GroupIndex
pResource = This.activeview.Days(0). ViewGroups (nr). MultipleResources (0)
psc = pResource.scheduleIDs
If pSc.Count> 0
    nsched=pResource.ScheduleIDs(0)
endif

Someone can help me. Thanks
Visual FoxPro
Codejock 15.1.3.0908
Windows7
Back to Top
 Post Reply Post Reply
  Share Topic   

Forum Jump Forum Permissions View Drop Down

Forum Software by Web Wiz Forums® version 12.04
Copyright ©2001-2021 Web Wiz Ltd.

This page was generated in 0.203 seconds.