Codejock Forums Homepage
Forum Home Forum Home > Codejock Products > Visual C++ MFC > Calendar
  New Posts New Posts RSS Feed - Multischedule + Weekview +Horizontal Scroll bug
  FAQ FAQ  Forum Search   Events   Register Register  Login Login

Multischedule + Weekview +Horizontal Scroll bug

 Post Reply Post Reply
Author
Message
Algae View Drop Down
Senior Member
Senior Member
Avatar

Joined: 08 January 2007
Location: United States
Status: Offline
Points: 217
Post Options Post Options   Thanks (0) Thanks(0)   Quote Algae Quote  Post ReplyReply Direct Link To This Post Topic: Multischedule + Weekview +Horizontal Scroll bug
    Posted: 23 October 2011 at 6:58pm
Calendar - using either the sample or my own implementation:

To duplicate:

1. Set the view to either Work Week view or Week view with Column mode.
2. Select multiple schedules (I used 3 to test).
3. Create an event in the first column.
4. Drag the event to the right. You will see the calendar display jump to the last column when the edge threshold is reached.
5. Drag the event to the left. You will see the calendar display jump to the first column when the edge threshold is reached.

This makes it impossible to drag and drop an event to some areas (days) inside a calendar displaying multiple schedules.
Back to Top
 Post Reply Post Reply
  Share Topic   

Forum Jump Forum Permissions View Drop Down

Forum Software by Web Wiz Forums® version 12.04
Copyright ©2001-2021 Web Wiz Ltd.

This page was generated in 0.188 seconds.