weeknumbers calendarcontrol |
Post Reply |
Author | |
axdoverm
Groupie Joined: 16 August 2008 Location: Netherlands Status: Offline Points: 14 |
Post Options
Thanks(0)
Posted: 12 January 2010 at 7:08am |
Hey Guys,
I have a problem with the agenda control. As you can see in the picture the weeknumbers are wrong. The agenda is showing that the 12th off january is weeknumber 3 but it should be weeknumber 2. And weeknumber 1 should be weeknumber 53 ??
Is there a way to change this ?? ... please help me !!! ... i really need a solution for this problem.
Gr. Andr
|
|
Product: Xtreme SuitePro (ActiveX) version 11.2.2
Platform: Windows XP (32bit) - SP 2 Language: Visual Basic 6.0 |
|
dentor
Senior Member Joined: 30 November 2005 Location: France Status: Offline Points: 102 |
Post Options
Thanks(0)
|
Hello Axdoverm,
You must set the FirstWeekOfYearDays property to 4 in the DatePicker object:
In the help File, you can read:
The FirstWeekOfYearDays property is needed because the first week of the year can be different depending on how many days occur in the first week. For example, in Germany the first week of the year has to be a week with at least four days. In the United States the first calendar week starts with January 1st.
|
|
Product: Xtreme SuitePro (ActiveX) version 13.0.0
Platform: Windows XP (32bit) - SP 3 Language: Visual Basic 6.0 SP 6 |
|
axdoverm
Groupie Joined: 16 August 2008 Location: Netherlands Status: Offline Points: 14 |
Post Options
Thanks(0)
|
Thank you verry much, the solution was easy .... properbly i was sleeping ... but i'm happy that this problem is fix!
|
|
Product: Xtreme SuitePro (ActiveX) version 11.2.2
Platform: Windows XP (32bit) - SP 2 Language: Visual Basic 6.0 |
|
Post Reply | |
Tweet
|
Forum Jump | Forum Permissions You cannot post new topics in this forum You cannot reply to topics in this forum You cannot delete your posts in this forum You cannot edit your posts in this forum You cannot create polls in this forum You cannot vote in polls in this forum |