Codejock Forums Homepage
Forum Home Forum Home > Codejock Products > ActiveX COM > Calendar
  New Posts New Posts RSS Feed - Time Reports for Calendar Events
  FAQ FAQ  Forum Search   Events   Register Register  Login Login

Time Reports for Calendar Events

 Post Reply Post Reply
Author
Message
reynoldsi View Drop Down
Newbie
Newbie


Joined: 25 March 2013
Status: Offline
Points: 2
Post Options Post Options   Thanks (0) Thanks(0)   Quote reynoldsi Quote  Post ReplyReply Direct Link To This Post Topic: Time Reports for Calendar Events
    Posted: 25 March 2013 at 2:05pm

I am using Codejock Xtreme Calendar ActiveX 2012 (15.3.1) with MS SQL Server.

Given the way the events are stored, I would like to know if anyone has a way to sum all scheduled events or select all occurrences of a recurring event over a period of time in order to calculate the overall time spent.

 

For example, does there already exist a method available to me to calculate the sum of the durations of the occurrences in a never ending series of events that has an occurrence every other day within a period of a month? This one situation is easy to find but there are many recurrence patterns. Is there something that will make this task easier at least?

 
Thanks
Back to Top
 Post Reply Post Reply
  Share Topic   

Forum Jump Forum Permissions View Drop Down

Forum Software by Web Wiz Forums® version 12.04
Copyright ©2001-2021 Web Wiz Ltd.

This page was generated in 0.188 seconds.