Codejock Forums Homepage
Forum Home Forum Home > Codejock Products > ActiveX COM > Calendar
  New Posts New Posts RSS Feed - Changing a allday event
  FAQ FAQ  Forum Search   Events   Register Register  Login Login

Changing a allday event

 Post Reply Post Reply
Author
Message
Ditte View Drop Down
Groupie
Groupie


Joined: 28 October 2007
Status: Offline
Points: 94
Post Options Post Options   Thanks (0) Thanks(0)   Quote Ditte Quote  Post ReplyReply Direct Link To This Post Topic: Changing a allday event
    Posted: 21 August 2008 at 3:08pm
Hi,

I can make new event (time from 2:00 to 4:00).
If I like to change it (doubleclick) an save the changes.
If I have a allday event, itīs not possible to change it back from allday to a short time event. I can change the text, but nor more.

Regards



Dittmar



Product: Xtreme SuitePro (ActiveX) 13.4.2

Platform: Win XP

Language: Visual Dataflex 16.1
Back to Top
AndreiM View Drop Down
Moderator Group
Moderator Group
Avatar

Joined: 18 August 2007
Status: Offline
Points: 132
Post Options Post Options   Thanks (0) Thanks(0)   Quote AndreiM Quote  Post ReplyReply Direct Link To This Post Posted: 21 August 2008 at 3:37pm
Set Event.AllDayEvent = False.
See our sample for more details.
Back to Top
 Post Reply Post Reply
  Share Topic   

Forum Jump Forum Permissions View Drop Down

Forum Software by Web Wiz Forums® version 12.04
Copyright ©2001-2021 Web Wiz Ltd.

This page was generated in 0.188 seconds.