Codejock Forums Homepage
Forum Home Forum Home > Codejock Products > ActiveX COM > Calendar
  New Posts New Posts RSS Feed - Two Questions
  FAQ FAQ  Forum Search   Events   Register Register  Login Login

Two Questions

 Post Reply Post Reply
Author
Message
elmsoftware View Drop Down
Groupie
Groupie
Avatar

Joined: 21 November 2006
Status: Offline
Points: 23
Post Options Post Options   Thanks (0) Thanks(0)   Quote elmsoftware Quote  Post ReplyReply Direct Link To This Post Topic: Two Questions
    Posted: 21 November 2006 at 12:09pm
Hello,
 
We are evaluating the CalenderPro control and it is excellent.
 
We use VB 6 and access in our applications.
 
Questions
1) In your example events.mdb, there are 4 tables:
- Event
- Options
- RecurrencePattern
- Schedules
If we want to use the CalendarPro control, do we need to add these four tables exactly as you have them? Can we change the names of the tables?
 
2) In the Print Preview dialog the Preview frame has a misspelling of Prewiew...is this spelling fixed in the production version of the control?
 
All the best,
 
John
Back to Top
sserge View Drop Down
Moderator Group
Moderator Group


Joined: 01 December 2004
Status: Offline
Points: 1297
Post Options Post Options   Thanks (0) Thanks(0)   Quote sserge Quote  Post ReplyReply Direct Link To This Post Posted: 21 November 2006 at 2:14pm
Hello John,

1)
a) Those tables could be created automatically by the Calendar's Database data provider if they doesn't exist.
b) yes, their names are hardcoded and can not be changed;
c) you can use any database and any tables structure you wish for storing your Calendar's data; but you'll have to implement your own Calendar Custom Data Provider methods.

2) Will fix for the next version

--
WBR,
Serge
Back to Top
 Post Reply Post Reply
  Share Topic   

Forum Jump Forum Permissions View Drop Down

Forum Software by Web Wiz Forums® version 12.04
Copyright ©2001-2021 Web Wiz Ltd.

This page was generated in 0.172 seconds.