Codejock Forums Homepage
Forum Home Forum Home > Codejock Products > ActiveX COM > Calendar
  New Posts New Posts RSS Feed - Adding custom non-working days
  FAQ FAQ  Forum Search   Events   Register Register  Login Login

Adding custom non-working days

 Post Reply Post Reply
Author
Message
flauzer View Drop Down
Senior Member
Senior Member
Avatar

Joined: 30 December 2003
Location: Italy
Status: Offline
Points: 108
Post Options Post Options   Thanks (0) Thanks(0)   Quote flauzer Quote  Post ReplyReply Direct Link To This Post Topic: Adding custom non-working days
    Posted: 02 February 2006 at 11:39am

Is there a way to (also in the future) :

1) adding CUSTOM non-working days in a special Calendarcontrol collection

2) to deal these special days like saturday-sunday, both in "rendering" (for example using red color....) and in recurrence match????(for example "the first working days of ...")

Thanks...

Flavio

Back to Top
sserge View Drop Down
Moderator Group
Moderator Group


Joined: 01 December 2004
Status: Offline
Points: 1297
Post Options Post Options   Thanks (0) Thanks(0)   Quote sserge Quote  Post ReplyReply Direct Link To This Post Posted: 02 February 2006 at 1:09pm
Hi,

It was already discussed there: http://forum.codejock.com/forum_posts.asp?TID=3434&KW=holida y

--
WBR,
Serge
Back to Top
 Post Reply Post Reply
  Share Topic   

Forum Jump Forum Permissions View Drop Down

Forum Software by Web Wiz Forums® version 12.04
Copyright ©2001-2021 Web Wiz Ltd.

This page was generated in 0.203 seconds.