Codejock Forums Homepage
Forum Home Forum Home > Codejock Products > ActiveX COM > Suite Pro
  New Posts New Posts RSS Feed - Calendar: Bind vs. Manual ??
  FAQ FAQ  Forum Search   Events   Register Register  Login Login

Calendar: Bind vs. Manual ??

 Post Reply Post Reply
Author
Message
vbuser View Drop Down
Newbie
Newbie


Joined: 22 January 2004
Status: Offline
Points: 39
Post Options Post Options   Thanks (0) Thanks(0)   Quote vbuser Quote  Post ReplyReply Direct Link To This Post Topic: Calendar: Bind vs. Manual ??
    Posted: 16 December 2005 at 12:07am

I cant seem to find events to ALTER the calendar data before it gets written to the database; I need some of the calendar "custom fields" to be written to a specific field name in the database for searching and joining with other tables in the database, I need to do this just before the record is written to to MDB database.

Is there a way to read/write data from the access database & update the calendar manually?

Thanks

Back to Top
 Post Reply Post Reply
  Share Topic   

Forum Jump Forum Permissions View Drop Down

Forum Software by Web Wiz Forums® version 12.04
Copyright ©2001-2021 Web Wiz Ltd.

This page was generated in 0.188 seconds.