| tslu   Newbie   Joined: 14 September 2006 Status: Offline Points: 8 |  Post Options  Thanks(0)  Quote  Reply  Topic: ScheduleID of Multiple Resources Posted: 21 September 2006 at 9:47pm | 
| 
   I want to find out whether it is possible to get the schedule/column id to which column a user choose to add a new event to.
    | |
|  | |
| sserge   Moderator Group   Joined: 01 December 2004 Status: Offline Points: 1297 |  Post Options  Thanks(0)  Quote  Reply  Posted: 22 September 2006 at 5:10am | 
| 
   Sure, take a look at how it is implemented in our VB CalendarSample: 
 -- WBR, Serge | |
|  | |