Codejock Forums Homepage
Forum Home Forum Home > Codejock Products > ActiveX COM > Calendar
  New Posts New Posts RSS Feed - multiple resource problem
  FAQ FAQ  Forum Search   Events   Register Register  Login Login

multiple resource problem

 Post Reply Post Reply
Author
Message
arianna View Drop Down
Newbie
Newbie


Joined: 16 November 2012
Location: Roma
Status: Offline
Points: 2
Post Options Post Options   Thanks (0) Thanks(0)   Quote arianna Quote  Post ReplyReply Direct Link To This Post Topic: multiple resource problem
    Posted: 16 November 2012 at 7:46am
Hi,
I have a problem with multiple resources. 
I use calendar Activex control with  .net 2008, Windows 7 64
The calendar is already inside the software and all goes well but now, I need to add multiple columns for every day in weekview.
I add the example code to my program but I cannot load multiple resources.
I have an error in 

g_DataResourcesMan.ApplyToCalendar(ocal) 

Even if I use the mnuMultiSchedulesSimple_Click is the same, but on the 

CalendarControl.SetMultipleResources(arResources)


The ERROR is “Value does not fall within the expected range”
Can you please Help me?

Thank you very much.
Arianna
Back to Top
 Post Reply Post Reply
  Share Topic   

Forum Jump Forum Permissions View Drop Down

Forum Software by Web Wiz Forums® version 12.04
Copyright ©2001-2021 Web Wiz Ltd.

This page was generated in 0.125 seconds.