Codejock Forums Homepage
Forum Home Forum Home > Codejock Products > Visual C++ MFC > Calendar
  New Posts New Posts RSS Feed - Multiple Schedules with Access DataProvider
  FAQ FAQ  Forum Search   Events   Register Register  Login Login

Multiple Schedules with Access DataProvider

 Post Reply Post Reply
Author
Message
lexicon View Drop Down
Groupie
Groupie


Joined: 26 January 2007
Status: Offline
Points: 46
Post Options Post Options   Thanks (0) Thanks(0)   Quote lexicon Quote  Post ReplyReply Direct Link To This Post Topic: Multiple Schedules with Access DataProvider
    Posted: 26 January 2007 at 11:42am
Hello
 
Is it possible to have a multiple schedule with Access as data provider?
Any sample
 
Thanks
Back to Top
sserge View Drop Down
Moderator Group
Moderator Group


Joined: 01 December 2004
Status: Offline
Points: 1297
Post Options Post Options   Thanks (0) Thanks(0)   Quote sserge Quote  Post ReplyReply Direct Link To This Post Posted: 31 January 2007 at 5:35am
Hi,

Yes, it is possible of course.

There are some information at our forum available on this. Search it by keywords [calendar access schedules].

Example is there: http://forum.codejock.com/forum_posts.asp?TID=6017

--
WBR,
Serge
Back to Top
 Post Reply Post Reply
  Share Topic   

Forum Jump Forum Permissions View Drop Down

Forum Software by Web Wiz Forums® version 12.04
Copyright ©2001-2021 Web Wiz Ltd.

This page was generated in 0.141 seconds.