Codejock Forums Homepage
Forum Home Forum Home > Codejock Products > ActiveX COM > Calendar
  New Posts New Posts RSS Feed - Calendar Week View Problem
  FAQ FAQ  Forum Search   Events   Register Register  Login Login

Calendar Week View Problem

 Post Reply Post Reply
Author
Message Reverse Sort Order
trims30 View Drop Down
Newbie
Newbie


Joined: 03 December 2009
Location: United States
Status: Offline
Points: 9
Post Options Post Options   Thanks (0) Thanks(0)   Quote trims30 Quote  Post ReplyReply Direct Link To This Post Topic: Calendar Week View Problem
    Posted: 19 November 2012 at 1:49pm
Question about using the Calendar Control ActiveX

In VB6 IDE I see the following as expected:


When Executing program I see


Is there a property or something I must change in order to see the Work Week/Full Week Radio Buttons?

Lee B.


Back to Top
 Post Reply Post Reply
  Share Topic   

Forum Jump Forum Permissions View Drop Down

Forum Software by Web Wiz Forums® version 12.04
Copyright ©2001-2021 Web Wiz Ltd.

This page was generated in 0.109 seconds.