Codejock Forums Homepage
Forum Home Forum Home > Codejock Products > Visual C++ MFC > Calendar
  New Posts New Posts RSS Feed - Data Source for Calendar Control
  FAQ FAQ  Forum Search   Events   Register Register  Login Login

Data Source for Calendar Control

 Post Reply Post Reply
Author
Message
rayou View Drop Down
Newbie
Newbie


Joined: 24 February 2006
Location: United States
Status: Offline
Points: 2
Post Options Post Options   Thanks (0) Thanks(0)   Quote rayou Quote  Post ReplyReply Direct Link To This Post Topic: Data Source for Calendar Control
    Posted: 24 February 2006 at 3:56pm

Hi,

Our company is evaluating the Extreme MFC Toolkit, the Calendar control, and I'm wondering: does the calendar control support other data sources other than XML and Access MDB?  The product we're thinking to integrate the Calendar control with, we store our data in MS SQL Server 2000.  Can we just pass in a connection string for SQL Server for CXTPCalendarDatabaseDataProvider to work?

Thank you,

Ann You

 

Back to Top
sserge View Drop Down
Moderator Group
Moderator Group


Joined: 01 December 2004
Status: Offline
Points: 1297
Post Options Post Options   Thanks (0) Thanks(0)   Quote sserge Quote  Post ReplyReply Direct Link To This Post Posted: 25 February 2006 at 2:29am
Back to Top
rayou View Drop Down
Newbie
Newbie


Joined: 24 February 2006
Location: United States
Status: Offline
Points: 2
Post Options Post Options   Thanks (0) Thanks(0)   Quote rayou Quote  Post ReplyReply Direct Link To This Post Posted: 28 February 2006 at 11:50am

Thanks for the reply.  Sounds like a lot of work to make it recognize SQL Server.  But we will take a look and see if it is feasible.

In the meantime, I'm wondering: does the Calendar control support multiple resources, and scheduling of multiple resources, like in Outlook?

Lastly, according to your website, we will get the complete source code for the toolkit, is that true, or that we will only get the sample projects source code?

Thank you,

Ann You

 

 

Back to Top
sserge View Drop Down
Moderator Group
Moderator Group


Joined: 01 December 2004
Status: Offline
Points: 1297
Post Options Post Options   Thanks (0) Thanks(0)   Quote sserge Quote  Post ReplyReply Direct Link To This Post Posted: 28 February 2006 at 1:42pm
Hi,

No, current version of the Calendar control does not support multiple resources, but we are working on adding this feature for the next major version of the toolkit.

Yes, complete source code is provided with C++/MFC toolkit.
It is limited to sample projects source code only for ActiveX versions of controls.

--
WBR,
Serge
Back to Top
 Post Reply Post Reply
  Share Topic   

Forum Jump Forum Permissions View Drop Down

Forum Software by Web Wiz Forums® version 12.04
Copyright ©2001-2021 Web Wiz Ltd.

This page was generated in 0.125 seconds.