Codejock Forums Homepage
Forum Home Forum Home > Codejock Products > Visual C++ MFC > Calendar
  New Posts New Posts RSS Feed - Multiple Schedulers
  FAQ FAQ  Forum Search   Events   Register Register  Login Login

Multiple Schedulers

 Post Reply Post Reply
Author
Message Reverse Sort Order
sserge View Drop Down
Moderator Group
Moderator Group


Joined: 01 December 2004
Status: Offline
Points: 1297
Post Options Post Options   Thanks (0) Thanks(0)   Quote sserge Quote  Post ReplyReply Direct Link To This Post Topic: Multiple Schedulers
    Posted: 22 January 2007 at 4:11pm
Looking at your sample -- we can have 5 schedules for each employee, and 2 resources -- "Team A" and "Team B" which will have corresponding schedules in their collections.

Also we have 1 event associated to Employee #2 schedule (Team A).

In this case by changing this event properties, it will be reflected on a column with Team A calendar.

Below is the sample config file:

<?xml version="1.0" encoding="UTF-8"?>
<CalendarMultiResourcesConfiguration CompactMode="1">
    <DataProviders>
        <DataProvider ConnectionString="Provider=XML;Data Source=file1"/>
    </DataProviders>
    <Resources>
        <Resource Name="Team A" Enabled="1" GenerateName="0" ConnectionString="Provider=XML;Data Source=file1" SchedulesCount="2">
            <Schedules ScheduleID="1"/>
            <Schedules ScheduleID="2"/>
        </Resource>
        <Resource Name="Team B" Enabled="1" GenerateName="0" ConnectionString="Provider=XML;Data Source=file1" SchedulesCount="3">
            <Schedules ScheduleID="3"/>
            <Schedules ScheduleID="4"/>
            <Schedules ScheduleID="5"/>
        </Resource>
    </Resources>
</CalendarMultiResourcesConfiguration>


--
WBR,
Serge
Back to Top
Khayyat71 View Drop Down
Newbie
Newbie
Avatar

Joined: 06 January 2007
Location: Jordan
Status: Offline
Points: 6
Post Options Post Options   Thanks (0) Thanks(0)   Quote Khayyat71 Quote  Post ReplyReply Direct Link To This Post Posted: 22 January 2007 at 2:56pm

I do have a simple question.

 

If I need to setup a group of employees (team) so I can let the user change the events for the whole (team) at the same time from the calender view.

 

Let me clarify it more...

If I have team A (3 employees) And Team B (2 employees), how can I adjust team A events from one calendar by simply changing the event time, so it will be reflected to all team A members?

                                                                                                                               

I'm wondering how resource and scheduler classes can help....

 

Thanks...

Hassan Khayyat

Back to Top
 Post Reply Post Reply
  Share Topic   

Forum Jump Forum Permissions View Drop Down

Forum Software by Web Wiz Forums® version 12.04
Copyright ©2001-2021 Web Wiz Ltd.

This page was generated in 0.172 seconds.