Codejock Forums Homepage
Forum Home Forum Home > Codejock Products > ActiveX COM > Calendar
  New Posts New Posts RSS Feed - viewchanged event
  FAQ FAQ  Forum Search   Events   Register Register  Login Login

viewchanged event

 Post Reply Post Reply
Author
Message
skiman View Drop Down
Groupie
Groupie


Joined: 20 December 2008
Location: Belgium
Status: Offline
Points: 88
Post Options Post Options   Thanks (0) Thanks(0)   Quote skiman Quote  Post ReplyReply Direct Link To This Post Topic: viewchanged event
    Posted: 03 June 2009 at 4:10pm
Hi,
 
The viewchanged event is fired if I move an event in the month view. This doesn't happen in a week view, which seems logical to me.
 
I expected that this event would only be fired if there is actually a change in the view, which means the begin and end date of the current via are effectively changing.
 
This should happen when chaning from day-week-month view, are when moving to previous or next periode.
 
Is this a bug and is there any change this will be solved in a next version?
 
Regards,
Chris Andries
ABO Service
Back to Top
 Post Reply Post Reply
  Share Topic   

Forum Jump Forum Permissions View Drop Down

Forum Software by Web Wiz Forums® version 12.04
Copyright ©2001-2021 Web Wiz Ltd.

This page was generated in 0.125 seconds.