Codejock Forums Homepage
Forum Home Forum Home > Codejock Products > ActiveX COM > Calendar
  New Posts New Posts RSS Feed - Focus Perticular Date
  FAQ FAQ  Forum Search   Events   Register Register  Login Login

Focus Perticular Date

 Post Reply Post Reply
Author
Message Reverse Sort Order
prashant View Drop Down
Senior Member
Senior Member
Avatar

Joined: 19 February 2007
Location: India
Status: Offline
Points: 165
Post Options Post Options   Thanks (0) Thanks(0)   Quote prashant Quote  Post ReplyReply Direct Link To This Post Topic: Focus Perticular Date
    Posted: 29 April 2008 at 8:05am
Try using

ShowDay / ShowDays function calls after switching the view.

For switching view use : SwitchActiveView()
Back to Top
AbhishekGoenka View Drop Down
Newbie
Newbie


Joined: 31 March 2008
Status: Offline
Points: 14
Post Options Post Options   Thanks (0) Thanks(0)   Quote AbhishekGoenka Quote  Post ReplyReply Direct Link To This Post Posted: 29 April 2008 at 7:59am
Hi

I am using calender Control

I want to select perticular day (focus) while switching from day view 1 to 5 or 7
Back to Top
 Post Reply Post Reply
  Share Topic   

Forum Jump Forum Permissions View Drop Down

Forum Software by Web Wiz Forums® version 12.04
Copyright ©2001-2021 Web Wiz Ltd.

This page was generated in 0.156 seconds.