Calendar Control Bugs |
Post Reply |
Author | |
jpcoffeyXXX
Groupie Joined: 16 August 2005 Location: United States Status: Offline Points: 31 |
Post Options
Thanks(0)
Posted: 10 June 2009 at 10:06am |
The CodeJock controls are great, howevery I think I may have found two bugs in the calendar control.
1. Using the datapicker, when switching to xtpCalendarDayView from any other view, the transition will proceed as expected with the day showing. When switching to xtpCalendarDayView from xtpCalendarWorkWeekView, the work week will change but the calendar will not move to xtpCalendarDayView. It will stay in xtpCalendarWorkWeekView no matter which day is clicked. The work week will change, but it will remain in work week mode.
2. Scroll bars. When using the SuiteControls vertical scroll bars, the scrolling works perfectly. However, if I transition out of time line mode, there will be two scroll bars showing with widely differing functionality. This can be verified using the delivered sample VB project for the calendar.
Cheers,
John P. Coffey
|
|
Post Reply | |
Tweet
|
Forum Jump | Forum Permissions You cannot post new topics in this forum You cannot reply to topics in this forum You cannot delete your posts in this forum You cannot edit your posts in this forum You cannot create polls in this forum You cannot vote in polls in this forum |